Hydronic heat pumps
They transfer heat to a water circuit for space heating. This includes air-, water-, ground- and waste-heat-source systems that meet the proposal’s definition.
Compare the proposed final-assembly requirement with a broader EU-production case, then follow the selected equipment premium into the complete installed price.
The proposal attaches the origin condition to the finished hydronic heat pump. It does not impose separate Union-origin quotas on the compressor, valves, heat exchanger or other internal components; the impact assessment describes EU final assembly as the intended production step.
They transfer heat to a water circuit for space heating. This includes air-, water-, ground- and waste-heat-source systems that meet the proposal’s definition.
Systems that deliver heated air directly, rather than heating space through a water circuit, are not covered by this proposed origin requirement.
Three years after entry into force, the proposal requires the finished hydronic heat pump to originate in the Union in covered public procurement and household or company support schemes.
Only the final product must be of Union origin, meaning its final assembly takes place in the EU.
Because data are scarce, the heat-pump calculation is simpler than for the other products: the installed cost premium is calculated as selected equipment premium × equipment share of complete installed price.
The Commission’s impact assessment finds that final assembly is neither energy- nor labour-intensive and can move to the EU without significantly increasing costs. 0% is therefore used.
All bars use the same scale.
Open any source for its exact figure, page and comparison basis.
Representative 12 kW air-to-water units at 85% factory utilisation. The around-60% EU premium is a broad regional production-cost comparison, not a verified Union-origin supply chain.
Following this assessment, 0% is used for EU final assembly. Values up to 30%, the part of the broad EU–China cost gap that is not due to components, can be tested with the slider.
Installed-price composition varies materially by country, system size and project. 50% is used as a rounded reference, with a 25–60% range; the low endpoint is based on the separate Commission platform anecdote, not this invoice sample.
The 40–50% installation-cost statement implies a 50–60% equipment share if equipment and installation make up the whole price. The 25% equipment-share slider endpoint comes from the separate anecdotal 75% installation figure; it is not a measured average.
The shares describe the composition of component value, not the share of total installed price and not EU–China cost premiums. They are shown only to explain the product.
After three years, the finished hydronic heat pump must originate in the Union in covered procurement and support schemes. Consumer compensation is capped at 15%, or 20% in energy-poverty schemes. Origin follows the Union Customs Code.